top of page

Bizkaia, Spain

Partners involved: BECSA, TECNALIA,

METABUILD, Onyx, KU LEUVEN

Estacion_DERIO

The acoustic barrier will be 50m length and 2,5m height (125 m²). BECSA will provide the full noise barrier, integrating asymmetrically composed laminated PV modules to optimize acoustic insulation, and integrating absorbent material in the source side, as designed in terms of shapes and compositions, to optimize acoustic absorption. Acoustic performance, and energy generation will be closely monitored on site. 

bottom of page